                   Project Development
 

Introduction
PUTRA is a short form of Projek Usahama Transit Aliran Ringan Automatik. The PUTRA LRT system is one of the remedies aim to make Kuala Lumpur free flowing city. The RM 4.5 Billion project which will span 29km from Lembah Subang Terminal to Perhentian Gombak has
24 stations located at 1.1 km interval. The project has 4.40 km underground track, 2.33km
at-grade track and 22.27 km elevated track

Underground track
They are two method building the underground track. The first method is by using Tunnel Boring Machine(TBM). The TBM's were manufactured by Hyundai-Pati Consortium and will be use for construction on the tunnel  from Damai to Ampang Park station then to KLCC and proceed to Kampung Baru.

       One of the RM 5 million Tunnel Boring Machines (TBM) weighting over 200 tonnes

The other method is using Earth Face Preasure Shield Driven Method. This method mimimises the sinking of earth by controlling the earth preasure at the cutter head of the shield, the amount of soil ejected and backfilling work is done simultaneosly with excavation work. Investigations were conducted before tunneling to protect and monittorr structure utilities near the tunneling route.
The method will be used for tunneling process from Sultan Ismail underground station to Benteng station then to Kampung Baru Station